Daewoo DVN-8100N Instruction Manual Page 51

  • Download
  • Add to my manuals
  • Print
  • Page
    / 125
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 50
DESCRIPTION,
INSTALLATION,
MAINTENANCE,
REPAIR
195-1
SIMPLEX-COMPACT
SEAL
2.
INSTALLATION
OF THE
SEAL
2.1
AFT
SEAL
-
Before
the
seal
is
pushed onto
the
propeller shaft
the
latter
must
be
checked
for
cleanness.
- The
seal
is
then
taken
out of the
plastic
bag and
examined
for
damage sustained during
the
transport.
- The
gasket (80)
and the
seal assembly with
the
fitted
liner
(1) are
placed
on the
shaft.
- The
gasket (80)
is
then
placed
in
position. Care
must
be
taken
to
ensure
that
bores
in the
casing flange
are
kept
clear.
- The
wood blocks
are now
removed from
the
casing
flange.
- The
casing
is
secured
by
means
of two
bolts
(7).
- The
lifting bracket (20)
is
removed
and
stored
onboard,
together
with
the
respective
fixing bolts
(21).
-
Threaded bores
are now
sealed,
using plugs (22)
and
packings
(19)
.
- The
remaining
bolts
(7) are
tightened
cross-wise,
and
secured using
chrome
steel wire.
-
Screws (14)
at
liner
flange
(1)
are
unscrewed.
-
Screws
(14)
are
removed
from cover ring
(5)
with
mounting
straps
(16).
-
Removed
srews
(14)
with
mounting straps
(16)
are
stored
on
board.
-
Screws (55)
and
replacing
screws
(14)
are
inserted
into
cover ring
(5)
.
- The
liner
(1)
is
then
cautiously
pushed
into
the
seal
casing.
- The
gasket (81)
is
placed
in
position.
- The
liner
(1)
is
then moved
to
make contact with
the
^
propeller
and
secured
by
bolts (10)
and
sealing
washers
(17).
3
-
Centring
of the
liner
is
checked
by two
dial gauges
simultaneously
in
chamber
II and
between
the
3
cover ring
and
liner
flange
in
accordance.
See
enclosed table
7-195-1260
$
- The
bolts (10)
are
secured
using chrome steel
wire
(18).
:
B+V
Industrietechnik
GmbH
P.O.
Box
11
2289,
D-20422
Hamburg
Page view 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 124 125

Comments to this Manuals

No comments