Daewoo DVN-8100N Instruction Manual Page 6

  • Download
  • Add to my manuals
  • Print
  • Page
    / 125
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 5
(2)
Bow &
Stern
Thruster
Wing
Control
Panel (Port, Starboard)
(IP-56)
Q'ty
(a)
Pitch control lever
2*2
(b)
Pitch
angle indicator
2*2
Analog
meter
(c)
Main
motor ammeter 2*2 Analog
meter
(d)
Control position demand push button
2*2
White with indicating lamp
(e)
Main
motor emergency stop push button
2
X
2
with lock
(f)
Dimmer push button
2x2
(g)
Buzzer stop push
button
2x2
(h)
Lamp
&
buzzer
test
push button
2*2
(i)
Thruster
run
indicating lamp
2><2
Green
(k)
Main
motor over load alarm lamp
2x2 Red
(1)
Thruster
abnormal alarm lamp
2
X
2
Red
(m)
Hyd. pump stop
alarm
lamp
2x2 Red
(n)
Alarm
buzzer
2
X
2
(3)
Pitch transmitter
Q'ty
1x2
(4)
Interface signals
for
V.D.R
(a)
Actual blade angle signal
:
-10VDC
(
Port
25°)
~
10VDC
(
St'bd
25°)
(b)
Thruster
status
signal
: on at
main motor
run
(5)
Zero pitch
system
(a)
This
mode
is
operated
independently
from
normal mode
by
pushing
of
this
mode
select button
on
W/H
control panel
3.8
Three
Phase
Induction
Motor
(1)
For
Hydraulic Pump Unit
1
set/vessel
Electric Motor
Motor Speed
Rating
Enclosure
Insulation
Space
Heater
Bow
Thruster
5.5kW
AC440V,
30, 4P,
60Hz
1760
rpm
Continuous
IP-44
Class
F
220V,
20W,
10
Stern
Thruster
5.5kW
AC440V,
30, 4P,
60Hz
1760
rpm
Continuous
IP-44
Class
F
220V,
20W,
10
Remark
3.9
Motor Stand
for
Main Motor
and
Foundation
Bolts
3.10
Aluminum
Anode
for
Thruster
Body
and
Duct (5.0
years)
3.11 Hand
pump
3.12
Bow /
Stern
room local control
box
3.13 Hyd. unit
starter
3.14
Em'cy
stop bush button
box for
forward
and
after mooring deck
2
sets/vessel
2
sets/vessel
2
sets/vessel
2
sets/vessel
2
sets/vessel
2
sets/vessel
4.
Exclusion
4.1
Centering
and
installing
of
side
thruster
unit.
4.2
Manufacturing
and
welding
of
nozzle
tube
and
bell mouse connected
to the
duct.
4.3
Manufacturing
and
installing
of
guard grid.
4.4
Anode
for
nozzle tube, bell mouth
and
guard
grid.
4.5
Connecting work
of
shaft coupling
- 3 -
Page view 5
1 2 3 4 5 6 7 8 9 10 11 ... 124 125

Comments to this Manuals

No comments