PROCESSING
DIVISION
mm
NOTE
1)
0
ring
and
their
grooves
to be
greased
up.
2)
Bolts
to be
tightened with specified
torgue.
>K1
Plug(101)
of hub to be
removed when
oil is
poured
into
the
thruster,
after
oil
will
be
overflown,
plug
to be
tightened
with seal tape
and
locked
by
punching.
%2
Plug(lG2)
to be
removed when
oil is
poured
into
the
thruster,
after
oil
will
be
overflown,
plug
to be
tightened
with seal
tape.
^3
To be
mounted with grease.
*4
To be
locked
by
welding.
%5
To be
mounted with
liquid
packing.
(Three Bond
1102)
*6
To be
tightened with
LOCTITE
242.
SS7
To be
locked
by
punching.
To
be
locked
by
welding
and
apply
the
filler(PORTLAND
CEMENT).
To
be
locked
by
welding
and
apply
the
filler(RESINOUS
PUTTY)
in the
grooves.
NAME
MATERIAL
KTE-MNAKASHIMA
KTE
CO..LTD.
MECHATRONICS
DIVISION
NAME
TOLERANCE
MIO.
\7
MARK
ww
vw
_w
V
DRAWN
TRACED
WORK
SPARE
R.E.Q.
WQGHT
REMARK
TCT-220
G.
A. OF
THRUST
UNIT
SCALE
DATE
OF
OWN
DRAWING
NO.
1/7
3rd
ANGLE
PRO)
Oct.
23,
2003
KJOOOO-003-1
Comments to this Manuals