Daewoo SG-7200D User Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
7
-Bus
s
-Bus
s
s
-Bus
s
s
The second fix involves simply clicking into place the
Marshalling Box ‘Lid’ (which contains all the lighting
control system electronics) and locking it in place with
two screws.
The Marshalling Box ‘Lid’ (which contains all the C-Bus
lighting control system electronics) is clicked into place and
locked with two screws.
C-Bus input devices, can then also be plugged into the
Marshalling Box using standard RJ45 connectors.
Second Fix
The luminaires leads, complete with Weiland plugs, are
than plugged into the Weiland sockets on the Marshalling
Box. No electrical terminations are required.
Second Fix
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 23 24

Comments to this Manuals

No comments